Cycle Therm
About Us Products Services Resources Request Info Contact Us
 
  Home / Resources
Here are some resources to keep you in the know:

Free Industry Tools


Operating Cost Calculator
  Want to calculate RTOs operating cost? Our exclusive calculator will calculate both gas and electrical costs based on your data. For a detailed explanation of how to calculate operating costs, see our white paper Debunking Sales Rhetoric: How to calculate RTO Operating Cost
Animated Schematic of an RTO
  See a 2-chamber RTO in action!
RTO Technical Specification
  Looking for an RTO technical specification? Click below for Cycle Therm’s technical specification information to insert directly into your bid request!
Industry FAQs
  Check out and download our frequently asked questions.

Case Studies

 

A Turnkey Installation for New England Container Company (PDF)
  New England Container Company was under the gun to purchase an air pollution control system to clean up the VOCs emitted from a paint line at their Baltimore steel drum recycling facility. They chose a turnkey installation of Cycle Therm’s 16,000 scfm 2-chamber RTO.
Titleist: There’s More Than One Green in Golf (PDF)
  As part of a corporate green initiative, Titleist decided to implement air correction systems for their golf ball paint and finish production lines in Massachusetts. After evaluating several air correction technologies, a 16,000 SCFM Regenerative Thermal Oxidizer (RTO) from Cycle Therm was selected as the air correction system best in alignment with Titleist’s priorities.

White Papers


Heat Recovery Media: Monolith/Structured vs. Random Packed (PDF)
  Choosing a heat recovery media for an RTO is not as simple as meets the eye. There are numerous misconceptions to overcome and many variables to consider in choosing a heat recovery media; especially in regard to thermal efficiency and VOC destruction efficiency.
Debunking Sales Rhetoric: How to calculate RTO Operating Cost (PDF)
  There is more to evaluating different vendors’ RTO proposals than selecting the low bidder. It is important to know a few things in order to effectively compare one vendor’s RTO proposal with another. While one vendor may appear to be the low bidder in up front capital equipment expenditures, they may end up being the most expensive when looking at the life cycle cost of the equipment.

Articles


RTO Innovation (PDF)

Industry Web Links



 

 
Case Study

Case Study: Titleist Golf Balls (PDF)
Titleist wanted to implement air correction systems for their golf ball paint and finish production lines in Massachusetts. See why they chose Cycle Therm.

Request more information online
with our easy request form, or call
us at (772) 486-4396.